Locating and aligning the gas turbine
Wed,Jan 20,2010 sunny
The installation of gas turbieng is going on.Now it’s just the preliminary aligning work.I take many photoes of the turbine as well as the gas bosstor compressor.The inner construction is very complicated.And the gas turbine is consisted of three mian parts.One is the front compressor which has 16 stages of moving blades.Two is the combustion chamber in which the fuel gas and compressed air mix and burn.Three is the turbine which has four stages of moving blades.The temperature in the first stage of moving turbine blades is as much as 1100 celsius degrees.
These three main parts are connected by big bolts arranged in a ring and they are supported by two bearing through which a high rigid shaft passes .
2010-1-21 0:31:38
I Guess I Guess I Guess Guess Guess
Thur,Jan 21-23,2010 sunny
I forget to write my diary for 3 days!SO bad!
These nights I watch some TV variety shows.The title is a show’s name.IT’S very famous in chinese world.Another TV show include playing magic.I played 4 hours warcraft!LOST!
One reason is that I am a little sick.When I focus on learning my head get dizzy.
My heart is not calm these days.
2010-1-24 17:24:55
Natural gas piping system
Sun,Jan 24-25,2010 sunny
A little busy with reading the documents and studying the drawings.The gas turbine and auxiliary equipments installation is going on.I feel time is precious.So many technologies I dont know.
2010-1-25 22:31:48