Thursday, December 17, 2009

Fog,cold

Fog,cold
Saturday, December 12,2009
This morning,I wear two shirts.Yesterday morning was a little cold.In the morning,there is thick fog.One shirt cannot keep heat.
The Bangladesh labors rise up early in the morning.It’s about 5:00.They have to spend nearly 2 hours in their journey to our site.So when they appear in front of us,they wear caps and scarves.Today,Mr YAO approved their request that they can arrive at our container office at 8:30.That means they can sleep half an hour more in bed.NICE.
I get up 7:30-40 in recent days.
NOW I NEED TO READ MY LITTLE ENGLISH-CHINESE DICTIONARY.I used it in my college English test.
2009-12-12 21:48:05

Supervising Job
Sunday, December 13, 2009
These days I introduce the mechanical work to a Bangladesh supervisors every mornig.This job is easy,and it’s also not easy sometimes. When a installation is going on,I have to invite the supervisor to check the work.And when the work is finished,I should get his signature on a inspection paper.That means a work is really completed.
Today,a section circular cooling water pipes was partly finished except backfilling.IN the design drawing,the backfilling material should be coarse sand.But the construction personnel use soil.That’s not suitable.But I cant persuade them.I am a little personnel. I dont know what my supervising friend will see and say tomorrow.
In work,one will contact with many sides of peple.Profit is all what a person want.IN many situations one’s honest is throwed away. Deceit made this worl much complex.We can live simple life and be comfortable in our heart.
2009-12-13 21:40:34


Busy with quality control documents
Mon+Tue,December 14-15,2009
I have to collect quality contoling papers for quality documents system.
Head is full of confusions.
Cannot calm down myself.
2009-12-15 14:21:30


Three “Request for inspection” papers
Wednesday,December 16,2009
Three types of pipes sectionally inspected this afternoon.
One is circular cooling water pipe.
The second pipe is fire protection pipe for outdoor transformer.
The third pipe is emergency pipe for lube oil skid.
It’s difficult to draft quality documents.I just start the first several sentences.
2009-12-16 17:19:26

Gas piping work
Thursday,December 17,2009
These days,a Bangladesh company workgroup is doing the cleaning work of gas pipes.This afernoon they are beginning to bury them under earth.The gas pipe is much thicker than cicular cooling pipe,for the reason of safety and high pressure.
While common steel pipe dont need to make groove at the junction end for welding,gas pipe must makes it.Groove(also called beveled edge) is cut for the use of firmly union by welding.
The little device which makes the groove is roundly fix beside the mouth of pipe.It consist of 3 main parts.The first is flame nozzle which spray out high-temperature flame cuting off steel edge aslant.The second is a chain which go around the pipe.The nozzle is fixed on the chain and it go on it like a train. The third is some gears and screw which make the nozzle move on the chain.
2009-12-17 22:54:13