Friday, October 30, 2009 Sunny
What did I do today?Too little to say.A ordinary day.
Let me say something about the food in Bangladesh.Firstly,I want to tell you that 1 dollar is equal to 7 yuans or 70 TKs.The prices are about the same level in Ban. and China.Do you know,we Chinese eat rice and dishes with chopsticks. But Bangladeshi eat food use their fingers! Just like Indians.That scene almostly nauseate me at first!Why not chopstick or fork? But I should respect one other nation’s custom.It’s just custom.
In a shop near our project site, a kind of cake costs 3 TKs.A labor may buy 4 to 5 pes for lunch. Because the way to home from work site is so long that it would spends 2 hours.Some carry lunches at morning.We Chinese only buy some drinks from this shop.A bootle of mango drink which contains 250 ml costs 20 TKs. It’s more expensive than Coca cola drink sold in China.Yes,there are red grape juice and carbonated drinks.I like mango and grape juices.There are some strange smell in their carbonated drinks.
Their lives are not easy. I see they often eat rice and pumpkin.May their lives get better.
2009-10-31 0:50:21
Saturday, October 31, 2009 Sunny
Today I want to say something about power plant’s main machine hall frame.The hall frame is consisted of 25 steel columns and many steel beams which link these columns.All these columns and beams are made in the shape of “H”.Like bigger ones of rails. These steel frames are transported here from China.
Columns are used for support.Beams make the frame more strong.These columns are consisted of two or three segments respectively.Every two segments are assemblyed vertically at site via steel plates and bolts. There are rows of holes on the conection ends of the to-be-assemblyed segments.And the same holes( in number and size) are drilled on two plates which are used to connected the two segments.Each side bolt a plate with many bolts which go through two plates and the segment between them.
The 25 columns support the whole quadrate hall which cover the main machine sets.A double rail for motor hoist will be put on the “branches” of the columns at the level of 12 m high.Columns are installed on reinforced concret pillars’ platforms with thick bolts.
Yes,these assembly and installation work need one or two cranes’ help.
2009-11-1 0:06:11
Sunday,Novermber 1,2009 Sunny
At night,we project managing department go to Chittagong city for big dinner.SINGING!
And now I am back.I am drunk.
SO LATE.
2009-11-2 0:19:30